Automatic Riveting Machine Ordering Process: Complete Steps from Spec Inquiry to Installation - BISUDI

Published: 2026-05-29 17:56:44   Views: 6 views   Author: admin

Automatic riveting machine ordering process: complete steps from spec inquiry to installation and commissioning

Customers buying an automatic riveting machine for the first time are often unsure what to prepare first and how long each step takes. This article breaks the BISUDI standard ordering process into eight steps and marks what the customer must coordinate at each, to ease project scheduling.

I. Eight-step ordering process

StepContentCustomer Coordination
1 Inquiry and send specsContact by phone/form, provide rivet and workpiece informationSend specs, drawings and capacity requirements
2 Solution and quotationSolution and price range in about 10 minutes, judging standard/non-standardConfirm the configuration direction
3 On-site trialEngineer brings a machine to the factory to sample with real workpiecesPrepare rivets, workpieces and cycle data
4 Contract and customizationConfirm model, price, lead time and warranty, sign the contractConfirm the quotation and contract terms
5 Design and productionNon-standard tooling design, procurement, assembly, in-house trialSend rivet samples promptly
6 Logistics and shippingStandard machines ship directly and fast, non-standard ship by milestoneConfirm delivery address and unloading conditions
7 Installation, commissioning and trainingOn-site installation, commissioning, on-site operation and maintenance trainingArrange operation and maintenance staff
8 After-sales and warranty1-year whole-machine warranty, long-term parts supply, nationwide responseDo daily maintenance by the inspection sheet

II. Key points of each step

Inquiry and solution stage.Providing all materials at once saves the most time: rivet head diameter, shank diameter, length and material, workpiece drawings or photos, plate thickness, point count, daily output and cycle requirements, and site air source and space. With complete materials a solution and price range comes in about 10 minutes, and complex non-standard cases generally get a preliminary solution within 1 business day.

Trial stage.For nationwide customers the manufacturer arranges an engineer to bring a matched model on site and test continuous feeding, cycle, pulling force and yield with real rivets and workpieces; routine on-site trials are free and not tied to purchase.

Production and acceptance stage.Standard models ship directly from stock quickly; after a non-standard model is assembled it is trialed continuously in-house with the customer's rivet samples, and the customer can accept at the factory or view sampling video and measured data, with shipping after qualified confirmation. Lead time follows the contract, and rush orders can be discussed in advance.

Automatic riveting machine installation, commissioning and on-site training
Photo: after a fixed model is delivered, on-site installation and commissioning plus operator training

III. Installation, commissioning and training content

ItemContent
Installation in placeMain-unit placement, air/electrical connection, feed-tube and gun-body installation
Parameter commissioningDebug feeding, pulling force and cycle by rivet spec, confirmed by continuous sampling
Operation trainingStartup, spec change, replenishment, counting, common alarm handling
Maintenance trainingDaily/weekly/monthly inspection, wear-part recognition and replacement

After delivery the whole machine carries a 1-year warranty, non-human issues 7-day return and 15-day exchange, and nozzles and other wear parts are supplied long term at cost; after-sales response is unified by the manufacturer nationwide. For customization-cycle details seeHow Long Does It Take to Customize an Automatic Riveting Machine。

IX. Handling common delivery problems after arrival

ProblemHandling Method
Appearance damage/missing parts on arrivalPhotograph on the spot for evidence and contact sales; logistics and spare parts are reissued by process
Insufficient on-site air pressureConfigure the pump per the manual; the engineer confirms air-source parameters at installation
Feeding not smooth after spec changeCheck whether nozzle/channel match, clear the channel and change the nozzle per training steps
Cycle falls short of expectationVerify whether the workpiece matches the trial sample; the engineer revisits to re-debug and trial
Operator turnoverRe-training or remote guidance can be requested; the equipment has a low operation threshold and is easy to learn

It is recommended that the customer internally designate one equipment owner to keep the manual, wear-part list and inspection sheet as the fixed contact window with the manufacturer, which makes delivery, training and after-sales handoff smoother.

Repeat or additional purchases by existing customers are simpler: the rivet specs, configuration and acceptance records of existing models are on file, and same-spec repeat purchases can directly confirm stock and shipping; for new specs or new product lines, only the new rivet and workpiece materials need supplementing to extend the existing solution, and the historical equipment file also eases unified maintenance, spare parts and training.

Ordering FAQ

Process FAQ

Q1: Can I trial first and then decide which to buy?

Yes, and this is also the standard process. First take an on-site trial to get measured data, then finally confirm the model and configuration to avoid a wrong purchase.

Q2: What is the payment method?

Payment is normally by contract-agreed milestones, with invoice type, tax/freight inclusion and other matters written into the quotation and contract.

Q3: What if workers still cannot operate after training?

Training is set to the standard of independent operation, with remote guidance or a repeat visit available afterward; the equipment has a low operation threshold and novices can take post after short training.

Q4: Can non-standard modifications be added after delivery?

Yes. New products and new rivet specs can be assessed on the existing model for nozzle changes, added channels or fixed tables; large modification needs get a new engineer solution, and existing customers reusing the current main unit save investment.

Nationwide customers: send specs now to start steps 1-2

Solution and price range in about 10 minutes, free on-site trial can be booked, consultation hotline +86 13556668682.

Further reading:What Materials Are Needed to Customize an Automatic Riveting Machine · Free On-Site Trial Policy and Process · Free On-Site Trial Process and Preparation

 

 

Free Nationwide On-site Trial

+86 13556668682 Book an On-site Trial
On-site Trial / Model Selection
Engineers bring the machine on site and sample with your workpieces

On-site trials are normally free; we will contact you within 1 business day.